Heaven for Hell

Harding Construction completed the fitout of the new Timaru Hell Pizza premises in July, 2016.

The Challenge

The new restaurant not only had a specific brand standard to achieve, but also required installation of specialised kitchen equipment that had to fit in a relatively confined space.

"It was important that all areas of the restaurant were finished to a high standard, not only reflecting the Hell Pizza brand but also ensuring maximum efficiency in all work spaces," says Simon Harding, Construction Manager for Harding Construction.

Some items took up more space than the plans had allowed for, so the team had to make adjustments once everything was on site and actual measurements could be taken.

Mr O, the proprietor, had a set budget and a set deadline for opening. It was imperative that all work be completed on time and on budget to meet these goals.

The Solution 

Hell pizza kitchen.jpg

"Saving a few centimetres here and there made a big difference" says Harding. Our main issue was that the fridge door hit the extractor hood in the kitchen when it opened. By adjusting the hood we were able to ensure that the fridge door could open freely and avoid damage to either piece of equipment."

Hell pizza inside small.jpg

The Result

Hell Pizza Timaru opened to flocks of enthusiastic customers on the due date. All equipment was installed without fuss and the fitout looked great. 

Mr O was effusive in his praise, "Our thanks to Harding Construction.You are professional and client focused. You gave lots of good advice to save us costs. The most important thing for us was that our project was finished within the set time scheduled." 

 

Hell pizza inside2.jpg